Minutes April 8, 2008
Wabasha County Board of Commissioners
Meeting of April 8, 2008
The Board of County Commissioners of Wabasha County, Minnesota, convened in Special Session at the Wabasha County Services Building, in the City of Wabasha, Minnesota on Tuesday, April 8, 2008 at 10:00 a.m.
The meeting (April 1, 2008) was reconvened and called to order by Board Chairman Riester. The following Commissioners were present: Windhorst, Dwelle, McNallan, Riester and Springer.
SPRINGER - DWELLE
Motion to approve the agenda.
Adopted Unanimously
There was no Consent Agenda.
DWELLE - SPRINGER
Resolution No.: 2008-094
Whereas, the Wabasha County Board of Commissioners has authorized a request for proposals regarding the categories listed below (Phase III) for the criminal justice center; and Whereas, the bid opening was held March 18, 2008; and
Whereas, Wabasha County's construction manager Construction Analysis and Management Inc. (CAM) has reviewed the bids and has made recommendations to the Board. Now Therefore
Be It Resolved by the Wabasha County Board of Commissioners that the following bids are awarded for Phase III of the Wabasha County criminal justice center project:

CATEGORY

TRADE CONTRACTOR

BASE BID

ALT. #2a

ALT. #2b

ALT. #3

1&2 – Concrete & Masonry

Plummer Concrete

$961,736.00

($7,700.00)

($7,700.00)

3 – Carpentry

Gopher State Contractors

$676,673.00

4 – Steel Stud/Drywall/FP

Superior Contractors

$675,000.00

5 – Woodwork/Casework

Northwest Cabinets

$404,295.00

$19,125.00

6 – Roofing

Kato Roofing

$522,650.00

7 – Joint Sealants

Waumandee Creek Sealants

$55,375.00

8 – Doors/Frames/Hdwr

Glewwe Doors

$173,995.00

9 – Alum Windows/Doors, Glazing

Ford Metro

$397,700.00

10 – Overhead Doors

Garage Door Store

$45,050.00

11 – Tile

Valley Tile

$97,879.00

12 – ACT/Acoustical Treatments

Twin City Acoustics

$242,520.00

13 – Resilient Flooring/Carpet

MCI, Inc.

$177,659.00

14 – Access Flooring

W.L. Hall

$19,945.00

15 – Painting/Wallcovering

Pompeii Painting

$249,456.00

16 – Seamless Epoxy Coating

Dynamic Concrete Resurfacing

$28,000.00

17 – Detention Equipment

Stronghold Industries

$652,000.00

18 – Laundry Equipment

MN Chemical Company

$20,022.00

21 – Elevators

MN Elevator

$133,518.00

22 – Fire Suppression

Fireline Sprinkler

$244,417.00

23 – Plumbing

DMC Plumbing & Heating

$2,197,717.00

24 – HVAC

Chappell Central

$1,039,000.00

25 – Test/Adjust/Balancing

Systems Mgmt & Balance

$39,990.00

26 – Temperature Controls

Winona Controls

$395,603.00

27&28 – Electrical & Generator

Vinco, Inc.

$3,257,555.00

29 – Security System

Accurate Controls

$513,100.00

30 – Asphalt/Curb/Gutter/ Walks

Road Constructors, Inc.

$372,900.00

TOTALS:

$13,593,755.00

($7,700.00)

($7,700.00)

$19,125.00

The deducts for Alternates 2a (fiber reinforcing (micro) in lieu of welded wire fabric) and 2b (fiber reinforcing (macro) in lieu of welded wire fabric) are approved and the add for Alternate 3 (solid surface countertops) is not approved. Contracts for Bid Categories 19 – Food Service Equipment, 20 – Courtroom Furniture, and 31 – Landscaping are rejected and will be reevaluated.
Be It Further Resolved that the Board Chair is authorized to sign and enter into a contract with the successful bidders as required in the request for proposal document.
Adopted Unanimously
3rd bonding not to exceed $2 million.
Recessed at 11:30 a.m.
Reconvened at 11:40 a.m.
WINDHORST - DWELLE
Motion to adjourn at 12:15 p.m.
Adopted Unanimously
 